Strategic Solutions for Your Success

 Expert project planning, forensic delay analysis, and clear progress reporting for Australia’s construction and infrastructure sectors.

Planning & Scheduling Setup

Every successful project begins with a solid planning foundation. Without a consistent planning framework, organisations face fragmented reporting, inconsistent schedule quality, and difficulty managing change. These gaps lead to delays, cost overruns, and a loss of stakeholder confidence.

We design and implement end-to-end planning and scheduling frameworks that equip your organisation with the structure, tools, and governance to deliver every project with precision and confidence.

Standardised Layouts

We design schedule templates tailored to your project type, sector, and WBS for total consistency.

Planning Procedures

Bespoke procedures defining exactly how schedules are prepared, updated, reviewed, and reported.

Progress Reporting

Structured, easy-to-use weekly templates for communicating project status and key risks.

Basis of Schedule (BoS)

Document templates ensuring your planning rationale is transparent, documented, and compliant.

Custom Dashboards

Dashboards in P6, MS Project, or Power BI that consolidate performance data into clear, actionable views.

Planning & Scheduling Services

“Great schedules aren’t built behind a desk—they’re built with your team.”

Too many project schedules are built in isolation—created to satisfy a contractual requirement, not to guide a project to success. At Consilia Advisory, we build schedules differently.

We work closely with your project managers, engineers, and site teams to develop programmes that are realistic, practical, and genuinely useful. Because when your schedule reflects reality, your project moves forward with confidence.

tender Schedule

A professional, compelling tender submission that proves you can deliver, built on realistic timelines, logical sequencing, and resource-driven planning.

Baseline Schedule

Detailed, contractually compliant baseline programmes that define your planned scope, sequencing, and milestones—setting the benchmark for project success.

Master Schedule

A unified roadmap that brings every contractor’s activities into one coherent roadmap, ensuring milestones are defined and the critical path is clearly mapped.

Lookahead Schedule

Actionable 1–12 week schedules that translate your overall plan into clear tasks, responsibilities, and manpower requirements for immediate execution.

Shutdown Schedule

Highly coordinated programmes for tight timeframes. We sequence activities clearly to minimize downtime and ensure operations resume safely and on time.

Recovery & Acceleration

Diagnose slippage, re-evaluate the critical path, and develop practical strategies to get your project back on track and regain momentum.

Interface Management

Structured processes to manage boundaries and track dependencies between parties, resolving conflicts before they impact your schedule or budget.

Resource Mapping

Accurate allocation of manpower and equipment using Primavera P6 and MS Project to prevent bottlenecks and ensure sustainable workloads.

Schedule Review & Analysis

A project schedule is only as valuable as its accuracy. Poorly structured schedules—those with logic errors, unrealistic durations, or missing constraints—create a false sense of control and leave projects exposed to significant risk.

Our independent review service identifies hidden risks, logic errors, and performance gaps. We benchmark every schedule against industry best practices (like the DCMA 14-Point Assessment) to give you the insight needed to make confident decisions.

Logic & Sequencing

We examine network logic to identify missing relationships, open ends, and logic loops.

Critical Path Analysis

Identify and validate the critical path, near-critical paths, and key float paths.

Quality & Completeness

Assess activity durations, resource assignments, WBS alignment, and standard compliance.

Risk Assessment

Analyse float across the schedule to identify sequences presenting the greatest risk to completion.

Baseline Comparison

Compare the current schedule against the approved baseline to pinpoint deviations and trends.

Contractor Review

Expert evaluation of submitted programmes to ensure they are realistic and fit for purpose.

Progress Monitoring & Reporting

We Don't Just Report—We Flag

Anyone can compile data and put it in a report. What sets us apart is what we do with that data.

We proactively identify risks, trends, and early warning signs—and bring them to your attention before they become problems. If your project is behind, you’ll hear it from us first—clearly, honestly, and with a clear recommendation on what to do next.

 

What We Deliver

Weekly/Monthly Reports

Structured updates covering status, completed work, risks, and overall trends.

Progress Dashboards

Visual snapshots presenting critical information simply and concisely.

S-Curves & KPIs

Visual comparisons of planned vs. actual progress and meaningful performance metrics.

Quantity Work Reporting

Standardised measurement to support accurate progress tracking and subcontractor payments.

Delay Analysis & EOT Claims

We Don't Just Report—We Flag

“On both sides of a delay claim, the strength of your analysis is everything.”

Every project faces change. Delays, disruptions, and unexpected events are part of the construction reality—but they don’t have to cost you time, money, or your commercial position.

 

We take a rigorous, evidence-based approach. We dig into the details, examine the facts, and deliver analysis that is credible, transparent, and aligned with globally recognised industry standards.

 

Society of Construction Law (SCL) Member

Our methodology aligns with the most respected international standards (AACEI & SCL).

What We Deliver

Forensic Delay Analysis

Structured updates covering status, completed work, risks, and overall trends.

Extension of Time (EOT) Claims

We prepare comprehensive, well-structured claims with clear cause-and-effect analysis, critical path evaluation (CPM), and concurrent delay assessment to maximise your entitlement.

Forensic Delay Analysis

Thorough investigation using globally accepted techniques (IAP, TIA, Window Analysis, Collapsed As-Built) to forensically establish the cause, effect, and quantum of delay.